Build modeSample data
Coverage
Supervisors need to see staffing gaps against the centre's configured room rules before a schedule is finalized.
Synthetic planning preview
Room coverage periods
| Room | Period | Expected children | Scheduled educators | Configured minimum | Status |
|---|---|---|---|---|---|
| Cedar Room (synthetic) | 8:30–11:30 | 13 | 2 | 2 | Covered No gap in this synthetic planning period. |
| Cedar Room (synthetic) | 14:30–15:00 | 13 | 1 | 2 | Review required One configured educator is missing before the schedule can be finalized. |
Planning boundary: Expected children come from a synthetic weekly schedule. Actual presence and educator attendance are not connected on this page.
Coverage changes remain disabled while this route uses sample data.
Prototype feedback
Choose how this concept should move forward.
Do not enter child, family, or staff information.